国产精品无码一区,国产香蕉网视频在线观看,国产日韩一区二区三免费高清夜夜,久久综合欧美亚洲精品

×

News

Conch Chuangye Wuwei Haichuang Domestic Waste-to-energy Project Successfully Realizes the First Car of Waste into the Plant
Date:2021-12-07 From:海螺創(chuàng)業(yè)

        With the correct leadership of the company and the strong support of various departments, with the cooperation and cooperation of the construction unit, the supervision unit, the participating units and the brothers, all the staff of Conch Venture will work together, December 5, 2021 10 At 18 hours, the Wuwei Municipal Solid Waste Incineration Power Generation Project realized the smooth entry of the first vehicle of solid waste into the plant. Wuwei Urban Management Bureau, Shijian Town Government, all staff of Conch Venture Wuwei Haichuang and relevant persons in charge of the participating units of the Wuwei Project witnessed this moment.

825aefb77dd1bc08762ce7b18994d46.jpg

The first garbage truck entered the factory smoothly 

        At 10:18 in the morning, the domestic garbage truck of Wuwei City was accompanied by a rumbling of firecrackers, dressed in red silk and red flowers, under the command of the Wuwei Haichuang site staff, passing the logistics gate, floor scales, and trestle slowly. Drive into the unloading hall. With the call of "Conch Venture Wuwei Haichuang's First Garbage Start Unloading", the household garbage was smoothly discharged into the garbage pit.

1b04ffa253032227961f55530d3ca0b.jpg

Group photo 

        The Conch Chuangye Wuwei Haichuang project is equipped with 2×500 tons/day mechanical grate furnace domestic waste incinerators. The project is planned at one time and implemented in two phases. The first phase of the project has a processing scale of 500 tons/day, and it can process domestic waste after reaching production capacity18 10,000 tons/year.

3d29ccb92d37edcdd7eebc8db6ec8fe.jpg

Conch Chuangye Wuwei Haichuang Domestic Waste Incineration Power Generation Project (Aerial View) 

        Conch Chuangye Wuwei Haichuang’s first truck of garbage entered the plant smoothly, marking the end of the construction of the Wuwei municipal solid waste incineration power generation project, which is about to enter the trial production stage, and the project will enter the "countdown" for grid-connected power generation. Conch Entrepreneurship and Wuwei Haichuang all staff will continue their efforts and sprint with all their strength, starting from the ceremony of the first truck of garbage entering the factory, supervising the completion of the project, making solid preparations before trial production, and launching a sprint to the grid-connected power generation target within the year. Make more contributions to the harmless treatment of domestic garbage and the improvement of the living environment in Wuwei City!

主站蜘蛛池模板: 西充县| 依安县| 循化| 瓦房店市| 宿州市| 腾冲县| 林西县| 峡江县| 巩留县| 黑龙江省| 景泰县| 扎赉特旗| 永顺县| 九龙坡区| 金平| 榕江县| 久治县| 华阴市| 南充市| 郧西县| 雷州市| 福泉市| 南澳县| 新蔡县| 双牌县| 黎川县| 缙云县| 屯留县| 叙永县| 进贤县| 岗巴县| 漳浦县| 天祝| 上栗县| 南充市| 鄂尔多斯市| 临城县| 吴忠市| 余干县| 合江县| 阿拉尔市|