国产精品无码一区,国产香蕉网视频在线观看,国产日韩一区二区三免费高清夜夜,久久综合欧美亚洲精品

×

News

Conch Venture Hejin Haichuang Domestic Waste Incineration and Power Generation Project, the first vehicle of waste enters the plant smoothly
Date:2021-10-31 From:海螺創(chuàng)業(yè)

        In the golden autumn of October, the blue sky is like washing. At 9:08 on October 29, 2021, with the instruction of the garbage entering the factory, four trucks full of domestic garbage with red silk passed through the weighbridge and slowly approached the unloading hall according to the transportation route. Conch Venture Hejin Haichuang welcomes the first truck of garbage to enter the factory smoothly. Li Xiping, director of the Standing Committee of the Hejin Municipal People's Congress, Li Minfu and Xue Shuhong, deputy directors, General Xue, deputy mayor of the government, all the staff of Conch Venture Hejin Haichuang and all participating units witnessed this exciting moment. 

4.jpg

The first truck of garbage enters the factory smoothly

5.jpg

Garbage enters the pit in an orderly manner

        Since the construction of the main plant of the project started in September 2020, with the strong support of governments at all levels, the company’s care and guidance, and the full cooperation of various participating units, Conch Venture Hejin Haichuang has worked hard to overcome the large volume, winter suspension, and continuous Rainfall, epidemic prevention and control and other difficulties, we went all out to grab the construction period and wall chart operations, and it took 13 months to achieve the important phased goal of garbage entering the factory.

1.jpg

Group photo

2.jpg

Aerial view of Hejin Haichuang project

        The smooth entry of the first truck of garbage into the plant indicates that Hejin City's domestic waste treatment has been transformed from traditional landfill to "resource, harmless, and reduced" utilization. It also means that Hejin Haichuang's domestic waste incineration power generation The project has officially entered the "countdown" for grid-connected power generation. In the next step, all the staff of Conch Venture Hejin Haichuang will continue to carry forward the Haichuang spirit of being the first, brave to innovate, bear hardships and stand hard work, and strive Grid-connected power generation as soon as possible.

主站蜘蛛池模板: 耒阳市| 吴桥县| 阿克| 四平市| 兴化市| 读书| 麻阳| 资中县| 兴山县| 定襄县| 罗江县| 洪雅县| 邵阳市| 江源县| 永仁县| 泰州市| 泸水县| 太仆寺旗| 兰州市| 大余县| 墨脱县| 东海县| 盐边县| 濉溪县| 巴中市| 佛学| 长泰县| 咸阳市| 永济市| 江山市| 封开县| 阿拉善左旗| 中宁县| 南阳市| 临夏市| 金湖县| 湘潭市| 南江县| 大理市| 新竹县| 密山市|