国产精品无码一区,国产香蕉网视频在线观看,国产日韩一区二区三免费高清夜夜,久久综合欧美亚洲精品

×

News

Conch Venture successfully signed the Hexian Waste-to-energy Project
Date:2020-12-12 From:海螺創業

        After 30 days of fighting at full capacity, Conch Venture welcomes good news.On December 12, 2020, Conch Venture and Hexian People's Government signed the "Ma'anshan City and County Vein Industrial Park Construction Project (Phase I) Franchise Agreement", planning to build a 600 tons/day domestic waste incineration power generation project.

        The signing ceremony was held in the first meeting room of Hexian Conference Center. Hexian County Party Secretary Chen Yonghong, Hexian County Mayor Wang Qiang; Conch Venture General Manager Ji Qinying, and Deputy General Manager Li Daming attended and witnessed the signing ceremony.

11.jpg

        At the signing ceremony, Secretary Chen Yonghong and General Manager Ji Qinying delivered speeches on behalf of both parties.

        Chen Yonghong extended a warm welcome to General Manager Ji Qinying and his party. He said that Hexian is currently at an important stage of actively integrating the city into the integrated high-quality development of the Yangtze River Delta. This signing is not only driven by the national macro policy, but also an urgent need for Hexian to build a new riverside ecological industry city.In the next step, the project will be promoted as a key project in Hexian County, highlighting industrial docking and supporting services, and vigorously promoting the construction of the project.

22.jpg

        Ji Qinying said that Hexian is at the forefront of the integrated development of the Yangtze River Delta, with convenient transportation, solid infrastructure and good business conditions. The cooperation between the two parties has great potential and broad prospects.It is hoped that the government and relevant departments will provide strong support in terms of project planning, land acquisition and demolition, application for approval and construction, and construction of supporting facilities, and simultaneously establish and improve the garbage collection, storage and transportation system, and further coordinate the integration of domestic garbage in Hanshan County and Zhengpu Port New District. 

33.jpg

        Before the project was signed, Ji Qinying, the general manager, went to the project site to conduct a field survey, and made specific arrangements for land acquisition surveying and mapping, road construction, and general plan optimization.

44.jpg

主站蜘蛛池模板: 绩溪县| 林芝县| 南华县| 即墨市| 高台县| 宁远县| 清苑县| 常德市| 抚顺市| 旺苍县| 鄂托克旗| 南宁市| 图片| 江门市| 天津市| 长泰县| 玛多县| 长春市| 安阳县| 南岸区| 湟源县| 枣强县| 平潭县| 津市市| 鄢陵县| 色达县| 屏东县| 城市| 青铜峡市| 彩票| 和田县| 安多县| 绥江县| 德阳市| 渝中区| 武鸣县| 高密市| 天长市| 海淀区| 榆林市| 吴川市|